A 3.4 hectare industrial energy site with existing network connection, generation infrastructure and supporting facilities, positioned for Battery Energy Storage System (BESS) and hybrid power development in the Wholesale Electricity Market (WEM).

3.4 Ha2 MW · 22 kVJenbacher J4202 MW / 8 MWhWEM · SWIS
Site aerial placeholder
Placeholder imagery

Opportunity overview

A rare combination of connection, plant and land

The MHPS site brings together established grid access, generation assets and site infrastructure—offered for sale on an as-is basis. Detailed commercial and technical information is available to qualified parties under NDA.

  • Established 2 MW network connection at 22 kV with synchronising switchgear and earthing grid already in place
  • Existing generation assets (Jenbacher J420 gas engine)
  • Supporting site infrastructure including shed, workshop and hardstand areas
  • Clear pathway for rapid deployment of a 2 MW / 8 MWh BESS and future hybrid expansion

3.4 Ha

Site area

Industrial land at Herron

2 MW

Network connection

22 kV · switchgear in place

J420

Generation asset

≈1.4 MW multi-fuel Jenbacher

BESS

Development path

2 MW / 8 MWh concept · NDA

Location

Herron · Peel region · SWIS

Herron sits in the Peel region of Western Australia, within the South West Interconnected System (SWIS). The site benefits from existing Western Power network infrastructure and a rural location that supports energy development with reduced constraint risk relative to many metropolitan sites.